Petworth Row House
A Colonial Row House in Washington DC.
Pages
Home
The House
Showing posts with label
cement
.
Show all posts
Showing posts with label
cement
.
Show all posts
We Have a New Floor and it's Level
First thing Thursday morning George arrived with his crew and a concrete truck ready to pour the new floor. After the plumbing ground work passed inspection George leveled the dirt floor (filling in around the new pipes and sump pump.
Read more »
Older Posts
Home
Subscribe to:
Posts (Atom)