Next they went to work on the drainage system. They dug down around the existing stack pipe and created a trench to the future bathroom. They replaced a portion of the old stack pipe and added a 3 inch branch off to the bathroom. Then they created three new branches for the sink, toilet and shower.
Here you can see how they created the first branch with the partially buried T joint.
No comments:
Post a Comment