The dig out was completed yesterday. They cut a line in the floor parallel to the back door and remove the remaining concrete and dirt.. There will be a small step up to the utility room.
 



Next they went to work on the drainage system. They dug down around the existing stack pipe and created a trench to the future bathroom. They replaced a portion of the old stack pipe and added a 3 inch branch off to the bathroom. Then they created three new branches for the sink, toilet and shower.  



Here you can see how they created the first branch with the partially buried T joint.


Next up is the plumbing inspection which we need to get done before the new flour is poured. Unfortunately the inspectors are a bit backed up and they wont get to us until Monday.