Pages

We Gained a Foot

To our surprise when we came home last night, George had nearly finished the dig out and instead of removing six inches of concrete and dirt he took out a foot. That's right, we went from having a finished 6'10" clearance to 7'4". The guys did an amazing job.




Five guys working really hard making the final push at the end of the day. Oh, and it was raining pretty hard.




All that's left is the area near the door and to cut a straight line from the all across the opening to the boiler room. There will be a small step up between the new hallway and the utility room.


George uncovered a few whole bricks from 1919 during the dig out.


Next up rough in the drain lines and get an inspector out here to approve it before they pour the new floor.

No comments:

Post a Comment